EVS Saar - Sewage Treatment Works - Wellesweiler

Design capacity: 67.000 HV

Dry weather flow:

1.215 m³/d


Wastewater treatment:


  • Mechanical pre-treatment
  • Rainwater pre-treatment
  • Aerobic biological preparation with
        upstreamed - denitrification
  • Anaerobic sludge treatment
  • Sludge dehydration
  • Use of sewage gas

  • Type of Advertisment:

    Product mix


    Production costs:

    15.600.000,-


    Construction period:

    1999 - 2002


    Size of order elementis consult:


    • Part VII HOAI: engineering work
    • Standard benefits
      • 1, 2, 3, 4, 5, 6, 7, 9
    • Extra benefits
      • Regional
        construction monitoring § 57 HOAI


    Order sum elementis consult:

    540.000,-


    Processing period:

    1996 – 2002