EVS Saar - Sewage Treatment Works - Oberleuken

Design capacity: 600 HV

Dry weather flow:

180 m³/d


Wastewater treatment:


  • Constructed wetlands for wastewater
    treatment with ventilated previous pool.


  • Type of Advertisment:

    detailed lump-sum contract


    Production costs:

    970.000,-


    Construction period:

    2005 – 2006


    Size of order elementis consult:



    Part VII, IX, II HOAI: engineering work
  • Standard benefits
    • 1 - 7, 9
  • Extra benefits
    • Regional construction monitoring § 57 HOAI


    Amount of work elementis consult:


    Part VII HOAI: engineering work

  • Standard benefits
    • 2 – 7
  • Extra benefits
    • Regional
      construction monitoring § 57 HOAI
      Mechanical engineering


    Processing period:

    2000 – 2006