EVS Saar - Sewage Treatment Works - Dillingen

Design capacity:

Hydraulic: 38.000 HV
Polluting load: 42.000 HV

Dry weather flow:

 9.120 m³/d


Wastewater treatment:


  • Mechanical pre-treatment
  • Rainwater pre-treatment
  • Aerobic biological preparation with
       upstreamed - denitrification
  • Anaerobic sludge treatment
  • Sludge dehydration
  • Use of sewage gas

  • Type of Advertisment:

    Immediate measure: Articles and conditions
    Total renovation: Product mix


    Total production costs:

    ca. 10.200.000,-


    Construction period:

    Immediate measure:  2004 - 2006
    Total renovation:  2010 - 2014


    Size of order elementis consult:


    Immediate measure:

    • Part VII HOAI: engineering work
    • Standard benefits
      • 2, 3, 4, 5, 6, 7, 9
    • Extra benefits
      • Regional
        construction monitoring § 57 HOAI

    Total renovation:

    • Part VII HOAI: engineering work
    • Standard benefits
      • 4, 5, 6, 7, 8, 9
    • Extra benefits
      • Regional
        construction monitoring § 57 HOAI


    Order sum elementis consult:

    Immediate measure:  142.920,-
    Total renovation:  484.228,-


    Processing period:

    Immediate measure:  2000 – 2006
    Total renovation:  2009 – 2014